{"id":1858,"date":"2026-05-20T08:39:18","date_gmt":"2026-05-20T08:39:18","guid":{"rendered":"https:\/\/vanlangdc.com\/?p=1858"},"modified":"2026-05-20T08:39:18","modified_gmt":"2026-05-20T08:39:18","slug":"concluding-a-white-night-of-construction-completing-the-750m%c2%b3-concrete-pour-at-bien-dong-hotel-project","status":"publish","type":"post","link":"https:\/\/vanlangdc.com\/en\/concluding-a-white-night-of-construction-completing-the-750m%c2%b3-concrete-pour-at-bien-dong-hotel-project\/","title":{"rendered":"Concluding a &#8220;White Night&#8221; of Construction: Completing the 750m\u00b3 Concrete Pour at Bien Dong Hotel Project"},"content":{"rendered":"<p><span style=\"color: #282828;\">As the city gradually falls into a deep sleep, hundreds of workers at the Bien Dong Hotel Project site enter a race against time. Under the night lights, concrete shipments are continuously transported, and every stage is strictly controlled with the goal of completing the pour on schedule while ensuring absolute quality and safety. After many hours of continuous construction, a &#8220;white night&#8221; concluded with a convincing result: the successful completion of the 750m\u00b3\u00a0concrete pour for the B2 basement slab in Zone 3.<\/span><\/p>\n<figure id=\"attachment_1584\" aria-describedby=\"caption-attachment-1584\" style=\"width: 1594px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1584 \" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/665937627_1491151362719463_4694560120539522113_n.jpg\" alt=\"After many hours of continuous construction, the Site Management Board successfully completed the 750m\u00b3 concrete pour for the B2 basement slab in Zone 3. \" width=\"1594\" height=\"1194\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/665937627_1491151362719463_4694560120539522113_n.jpg 1276w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/665937627_1491151362719463_4694560120539522113_n-534x400.jpg 534w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/665937627_1491151362719463_4694560120539522113_n-1068x800.jpg 1068w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/665937627_1491151362719463_4694560120539522113_n-768x575.jpg 768w\" sizes=\"auto, (max-width: 1594px) 100vw, 1594px\" \/><figcaption id=\"caption-attachment-1584\" class=\"wp-caption-text\"><\/span> <span style=\"color: #282828;\">After many hours of continuous construction, the Site Management Board successfully completed the 750m\u00b3 concrete pour for the B2 basement slab in Zone 3. <\/span><\/figcaption><\/figure>\n<h3 data-path-to-node=\"5\"><strong><span style=\"color: #282828;\">Strict Control of Progress and Quality Throughout Construction<\/span><\/strong><\/h3>\n<p data-path-to-node=\"6\"><span style=\"color: #282828;\">Following urgent preparations and a night of high-intensity work, on the morning of April 4, 2026, the Bien Dong Hotel Project Management Board completed the concrete pouring for the B2 basement slab in Zone 3. With a total volume of 750m\u00b3, the work absolutely met all requirements for progress, technical quality, and labor safety.<\/span><\/p>\n<p data-path-to-node=\"7\"><span style=\"color: #282828;\">This is one of the key categories in the project&#8217;s substructure construction phase and represents the second-largest concrete pour at the site to date. Completing the task on schedule further affirms the organizational capacity, the synchronized coordination between departments, and the high sense of responsibility of the entire team of engineers, staff, and workers on site.<\/span><\/p>\n<figure id=\"attachment_1586\" aria-describedby=\"caption-attachment-1586\" style=\"width: 1920px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1586 size-full\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666044441_1491149999386266_815737518401411405_n.jpg\" alt=\"This concrete pour represents the second-largest volume since the project's construction began.\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666044441_1491149999386266_815737518401411405_n.jpg 1920w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666044441_1491149999386266_815737518401411405_n-600x400.jpg 600w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666044441_1491149999386266_815737518401411405_n-1200x800.jpg 1200w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666044441_1491149999386266_815737518401411405_n-768x512.jpg 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666044441_1491149999386266_815737518401411405_n-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><figcaption id=\"caption-attachment-1586\" class=\"wp-caption-text\"><\/span> <span style=\"color: #282828;\">This concrete pour represents the second-largest volume since the project&#8217;s construction began.<\/span><\/figcaption><\/figure>\n<p data-path-to-node=\"9\"><span style=\"color: #282828;\">For underground structural categories, especially basement slabs with large areas and volumes, concrete pouring is always considered one of the most critical stages. It requires strict continuity, concrete uniformity, and the ability to control quality throughout the process. Therefore, all preparations for this pour were meticulously implemented by the Site Management Board several days in advance.<\/span><\/p>\n<p data-path-to-node=\"10\"><span style=\"color: #282828;\"><strong>Sharing the implementation process, Mr. Dang Minh Hanh \u2013 Project Director, stated:<\/strong> <i data-path-to-node=\"10\" data-index-in-node=\"83\">\u201cThe concrete pouring for the B2 basement slab in Zone 3 was carefully prepared, from site organization and material control to personnel planning and construction equipment. Throughout the implementation, the Management Board maintained continuous construction and close coordination between departments to control concrete quality, ensuring the uniformity and bonding of the entire structure. Particularly, working under nighttime conditions requires high concentration and strict discipline at all stages. The entire process was closely monitored according to technical standards, ensuring safety and meeting the project&#8217;s progress requirements.\u201d<\/i><\/span><\/p>\n<figure id=\"attachment_1582\" aria-describedby=\"caption-attachment-1582\" style=\"width: 1920px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1582 size-full\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/662836972_1490363329464933_8130654266467052106_n.jpg\" alt=\"The concrete pouring was carefully prepared by the Site Management Board, from site organization and material control to personnel and equipment planning.\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/662836972_1490363329464933_8130654266467052106_n.jpg 1920w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/662836972_1490363329464933_8130654266467052106_n-600x400.jpg 600w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/662836972_1490363329464933_8130654266467052106_n-1200x800.jpg 1200w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/662836972_1490363329464933_8130654266467052106_n-768x512.jpg 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/662836972_1490363329464933_8130654266467052106_n-1536x1024.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><figcaption id=\"caption-attachment-1582\" class=\"wp-caption-text\"><\/span> <span style=\"color: #282828;\">The concrete pouring was carefully prepared by the Site Management Board, from site organization and material control to personnel and equipment planning.<\/span><\/figcaption><\/figure>\n<h3 data-path-to-node=\"12\"><span style=\"color: #282828;\">Decisively Accelerating the Substructure Phase<\/span><\/h3>\n<p data-path-to-node=\"13\"><span style=\"color: #282828;\">The successful completion of the 750m\u00b3\u00a0concrete pour is not just an important progress milestone; it also demonstrates the proactive spirit, high determination, and organizational capacity of the Management Board in a context where project progress is always held to high standards. A &#8220;white night&#8221; closed with clear and convincing results, providing further motivation for the entire site to accelerate the next categories in the substructure phase.<\/span><\/p>\n<p data-path-to-node=\"14\"><span style=\"color: #282828;\">Each progress milestone completed today serves as a vital foundation for Van Lang to continue affirming its contractor prestige through construction quality, professional management, and a commitment to accompanying the developer in creating sustainable, safe, and long-lasting structures.<\/span><\/p>\n<figure id=\"attachment_1585\" aria-describedby=\"caption-attachment-1585\" style=\"width: 1480px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1585\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666024437_1491152686052664_3198286568943342318_n.jpg\" alt=\"Each completed progress milestone serves as convincing evidence of Van Lang's construction prestige.\" width=\"1480\" height=\"1110\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666024437_1491152686052664_3198286568943342318_n.jpg 1280w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666024437_1491152686052664_3198286568943342318_n-533x400.jpg 533w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666024437_1491152686052664_3198286568943342318_n-1067x800.jpg 1067w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2026\/05\/666024437_1491152686052664_3198286568943342318_n-768x576.jpg 768w\" sizes=\"auto, (max-width: 1480px) 100vw, 1480px\" \/><figcaption id=\"caption-attachment-1585\" class=\"wp-caption-text\"><\/span> <span style=\"color: #282828;\">Each completed progress milestone serves as convincing evidence of Van Lang&#8217;s construction prestige.<\/span><\/figcaption><\/figure>\n<p><span style=\"color: #282828;\">The Bien Dong Hotel project is located on Thuy Van Street \u2013 one of the most beautiful and vibrant coastal routes in Vung Tau. With its prime location and methodical investment scale, the project is expected to become a prominent architectural highlight upon completion, contributing to the urban landscape and the development of a high-quality resort tourism ecosystem for the region.<\/span><\/p>\n<p style=\"text-align: right;\"><span style=\"color: #282828;\"><em>Lan Anh<\/em><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As the city gradually falls into a deep sleep, hundreds of workers at the Bien Dong Hotel Project site enter a race against time. Under the night lights, concrete shipments are continuously transported, and every stage is strictly controlled with the goal of completing the pour on schedule while ensuring absolute quality and safety. After [&#8230;]\n","protected":false},"author":1,"featured_media":1587,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1858","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts\/1858","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/comments?post=1858"}],"version-history":[{"count":2,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts\/1858\/revisions"}],"predecessor-version":[{"id":1860,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts\/1858\/revisions\/1860"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/media\/1587"}],"wp:attachment":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/media?parent=1858"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/categories?post=1858"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/tags?post=1858"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}