{"id":1842,"date":"2026-05-20T08:09:18","date_gmt":"2026-05-20T08:09:18","guid":{"rendered":"https:\/\/vanlangdc.com\/?p=1842"},"modified":"2026-05-20T08:09:18","modified_gmt":"2026-05-20T08:09:18","slug":"hacom-mall-from-a-solid-foundation-to-a-prosperous-future","status":"publish","type":"post","link":"https:\/\/vanlangdc.com\/en\/hacom-mall-from-a-solid-foundation-to-a-prosperous-future\/","title":{"rendered":"Hacom Mall: From a Solid Foundation to a Prosperous Future"},"content":{"rendered":"<p data-path-to-node=\"3\"><span style=\"color: #282828;\">Right in the heart of Phan Rang &#8211; Thap Cham City, the Hacom Mall Commercial Center project is gradually taking on its grand appearance after months of continuous, urgent, and determined construction by the Van Lang collective.<\/span><\/p>\n<h3 data-path-to-node=\"4\"><span style=\"color: #282828;\">Progress Milestones \u2013 Affirming General Contractor Capacity<\/span><\/h3>\n<p data-path-to-node=\"5\"><span style=\"color: #282828;\">By mid-July 2025, Hacom Mall recorded a series of significant construction milestones, showcasing a proud scale and pace:<\/span><\/p>\n<ul data-path-to-node=\"6\">\n<li>\n<p data-path-to-node=\"6,0,0\"><span style=\"color: #282828;\"><b data-path-to-node=\"6,0,0\" data-index-in-node=\"0\">Completed 6,274<strong>m2<\/strong>\u00a0of basement floor slabs<\/b> with a solid foundation structure, ensuring long-term durability for the entire project.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"6,1,0\"><span style=\"color: #282828;\"><b data-path-to-node=\"6,1,0\" data-index-in-node=\"0\">Nearly 6,000<strong>m3<\/strong>\u00a0of concrete<\/b> poured with precision and synchronization, strictly adhering to technical standards and quality inspection processes.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"6,2,0\"><span style=\"color: #282828;\"><b data-path-to-node=\"6,2,0\" data-index-in-node=\"0\">Over 450,000 kg of various steel types<\/b> fabricated and installed accurately, meeting all technical regulations.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"6,3,0\"><span style=\"color: #282828;\">On average, the site operates <b data-path-to-node=\"6,3,0\" data-index-in-node=\"30\">2 tower cranes, 12 pump trucks, and material transport vehicles<\/b> daily, working continuous overtime shifts to ensure uninterrupted progress.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"6,4,0\"><span style=\"color: #282828;\"><b data-path-to-node=\"6,4,0\" data-index-in-node=\"0\">Over 152 technical staff and workers<\/b> joining hands, working with the highest sense of responsibility.<\/span><\/p>\n<\/li>\n<\/ul>\n<p data-path-to-node=\"7\"><span style=\"color: #282828;\">These impressive figures not only reflect the project&#8217;s scale but also serve as clear evidence of the professional and experienced construction organization of Van Lang \u2013 a leading reputable General Contractor in Vietnam.<\/span><\/p>\n<p data-path-to-node=\"8\"><span style=\"color: #282828;\">With the motto <b data-path-to-node=\"8\" data-index-in-node=\"15\">&#8220;Granting Trust \u2013 Upholding Prestige,&#8221;<\/b> Van Lang views Hacom Mall not merely as a commercial project but as a mission to create modern living and business spaces, contributing to the urban transformation of Phan Rang \u2013 Thap Cham.<\/span><\/p>\n<figure id=\"attachment_1053\" aria-describedby=\"caption-attachment-1053\" style=\"width: 1600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1053 size-full\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/7-1.png\" alt=\"The Hacom Mall Commercial Center project is gradually taking on its grand appearance after months of continuous construction.\" width=\"1600\" height=\"1200\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/7-1.png 1600w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/7-1-533x400.png 533w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/7-1-1067x800.png 1067w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/7-1-768x576.png 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/7-1-1536x1152.png 1536w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><figcaption id=\"caption-attachment-1053\" class=\"wp-caption-text\"><\/span> <span style=\"color: #282828;\">The Hacom Mall Commercial Center project is gradually taking on its grand appearance after months of continuous construction.<\/span><\/figcaption><\/figure>\n<h3 data-path-to-node=\"10\"><span style=\"color: #282828;\">A Journey to Create a Prosperous Space<\/span><\/h3>\n<p data-path-to-node=\"11\"><span style=\"color: #282828;\">From the very first days of commencement, Van Lang General Contractor proactively implemented synchronized and rigorous quality control solutions:<\/span><\/p>\n<ul data-path-to-node=\"12\">\n<li>\n<p data-path-to-node=\"12,0,0\"><span style=\"color: #282828;\"><b data-path-to-node=\"12,0,0\" data-index-in-node=\"0\">100% of input materials<\/b> are strictly inspected for origin traceability and must meet the highest technical standards.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"12,1,0\"><span style=\"color: #282828;\"><b data-path-to-node=\"12,1,0\" data-index-in-node=\"0\">Formwork systems, steel structures, and basement slabs<\/b> are inspected at every stage before execution, ensuring absolute safety and precision.<\/span><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"12,2,0\"><span style=\"color: #282828;\"><b data-path-to-node=\"12,2,0\" data-index-in-node=\"0\">Internal and independent supervision processes<\/b> are conducted continuously, ensuring that every handed-over category achieves optimal quality.<\/span><\/p>\n<\/li>\n<\/ul>\n<figure id=\"attachment_1054\" aria-describedby=\"caption-attachment-1054\" style=\"width: 1600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1054 size-full\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/8-2.png\" alt=\"The material inspection process at Van Lang is strictly controlled.\" width=\"1600\" height=\"1066\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/8-2.png 1600w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/8-2-600x400.png 600w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/8-2-1201x800.png 1201w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/8-2-768x512.png 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/8-2-1536x1023.png 1536w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><figcaption id=\"caption-attachment-1054\" class=\"wp-caption-text\"><\/span> <span style=\"color: #282828;\">The material inspection process at Van Lang is strictly controlled.<\/span><\/figcaption><\/figure>\n<p><span style=\"color: #282828;\">Above all, every shift is not just hours of persistent labor but also a testament to the solidarity and aspiration of the Van Lang team-the people who are turning blueprints into sustainable structures in reality.<\/span><\/p>\n<figure id=\"attachment_1055\" aria-describedby=\"caption-attachment-1055\" style=\"width: 1854px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1055 \" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/9-1.png\" alt=\"More than anyone, we understand that trust is not built on words, but from precision in the smallest details.\" width=\"1854\" height=\"1043\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/9-1.png 1280w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/9-1-711x400.png 711w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/9-1-768x432.png 768w\" sizes=\"auto, (max-width: 1854px) 100vw, 1854px\" \/><figcaption id=\"caption-attachment-1055\" class=\"wp-caption-text\"><\/span> <span style=\"color: #282828;\">More than anyone, we understand that trust is not built on words, but from precision in the smallest details.<\/span><\/figcaption><\/figure>\n<p><span style=\"color: #282828;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1056\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/10.jpg\" alt=\"\" width=\"1600\" height=\"1200\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/10.jpg 1600w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/10-533x400.jpg 533w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/10-1067x800.jpg 1067w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/10-768x576.jpg 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/10-1536x1152.jpg 1536w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/span><\/p>\n<figure id=\"attachment_1057\" aria-describedby=\"caption-attachment-1057\" style=\"width: 1600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1057 size-full\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/11-1.png\" alt=\"Formwork systems, steel structures, and basement slabs are inspected at every stage before execution, ensuring absolute safety and precision.\" width=\"1600\" height=\"1200\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/11-1.png 1600w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/11-1-533x400.png 533w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/11-1-1067x800.png 1067w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/11-1-768x576.png 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/11-1-1536x1152.png 1536w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><figcaption id=\"caption-attachment-1057\" class=\"wp-caption-text\"><\/span> <span style=\"color: #282828;\">Formwork systems, steel structures, and basement slabs are inspected at every stage before execution, ensuring absolute safety and precision.<\/span><\/figcaption><\/figure>\n<p><span style=\"color: #282828;\">In the future, Hacom Mall is positioned to become the most bustling commercial and service hub in the center of Phan Rang \u2013 Thap Cham, gathering reputable brands and modern shopping, entertainment, and culinary amenities to meet the increasingly diverse needs of residents and tourists.<\/span><\/p>\n<figure id=\"attachment_1058\" aria-describedby=\"caption-attachment-1058\" style=\"width: 1600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1058 size-full\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/12-1.png\" alt=\"Internal and independent supervision processes at the Hacom Mall project are conducted continuously to create superior quality for customers.\" width=\"1600\" height=\"904\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/12-1.png 1600w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/12-1-708x400.png 708w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/12-1-1400x791.png 1400w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/12-1-768x434.png 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/12\/12-1-1536x868.png 1536w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><figcaption id=\"caption-attachment-1058\" class=\"wp-caption-text\"><\/span> <span style=\"color: #282828;\">Internal and independent supervision processes at the Hacom Mall project are conducted continuously to create superior quality for customers.<\/span><\/figcaption><\/figure>\n<p><span style=\"color: #282828;\">The project is expected to reach its <b data-path-to-node=\"19\" data-index-in-node=\"37\">topping-out milestone in the first quarter of 2026<\/b>, marking the transition to the finishing stage and early handover. This is the result of a steadfast will, unceasing effort, and the desire to accompany the sustainable development of Phan Rang \u2013 Thap Cham City.<\/span><\/p>\n<p style=\"text-align: right;\"><span style=\"color: #282828;\"><em>Lan Anh<\/em><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Right in the heart of Phan Rang &#8211; Thap Cham City, the Hacom Mall Commercial Center project is gradually taking on its grand appearance after months of continuous, urgent, and determined construction by the Van Lang collective. Progress Milestones \u2013 Affirming General Contractor Capacity By mid-July 2025, Hacom Mall recorded a series of significant construction [&#8230;]\n","protected":false},"author":1,"featured_media":1844,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1842","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts\/1842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/comments?post=1842"}],"version-history":[{"count":1,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts\/1842\/revisions"}],"predecessor-version":[{"id":1845,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts\/1842\/revisions\/1845"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/media\/1844"}],"wp:attachment":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/media?parent=1842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/categories?post=1842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/tags?post=1842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}