{"id":1814,"date":"2026-05-20T07:05:03","date_gmt":"2026-05-20T07:05:03","guid":{"rendered":"https:\/\/vanlangdc.com\/?p=1814"},"modified":"2026-05-20T07:07:23","modified_gmt":"2026-05-20T07:07:23","slug":"july-17-2025-a-silent-yet-significant-milestone-at-the-hacom-mall-project","status":"publish","type":"post","link":"https:\/\/vanlangdc.com\/en\/july-17-2025-a-silent-yet-significant-milestone-at-the-hacom-mall-project\/","title":{"rendered":"July 17, 2025 \u2013 A Silent Yet Significant Milestone at the Hacom Mall Project"},"content":{"rendered":"<p data-path-to-node=\"3\"><span style=\"color: #282828;\">While the city fell into a deep sleep, a silent but extraordinary &#8220;transformation&#8221; took place at the Hacom Mall Commercial Center project (Dong Hai Ward, Ninh Thuan Province). More than 380m\u00b3\u00a0of concrete were poured in the final batch for the B2 basement floor slab, officially completing the deepest basement level of the project. This is not only a major technical milestone but also marks the conclusion of a pivotal construction phase, opening the journey to conquer the next progress targets at Hacom Mall.<\/span><\/p>\n<h3><strong><span style=\"color: #282828;\">3.530 m\u00b3 of Concrete \u2013 A Solid Foundation for a Landmark Project<\/span><\/strong><\/h3>\n<p data-path-to-node=\"5\"><span style=\"color: #282828;\">The construction of the B2 basement was implemented in several stages with a total concrete volume of up to 3,530m\u00b3. This is one of the project&#8217;s most technically demanding structural components, where no margin of error is permitted.<\/span><\/p>\n<p data-path-to-node=\"6\"><span style=\"color: #282828;\">The completion of this item is a clear testament to the well-organized construction capacity, high technical proficiency, and modern management mindset of the General Contractor, Van Lang. At the same time, it demonstrates an elite level of control over progress, quality, and safety-the core elements required to create a sustainable structure.<\/span><\/p>\n<figure id=\"attachment_718\" aria-describedby=\"caption-attachment-718\" style=\"width: 2048px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-718 size-full\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/be-tong-1.png\" alt=\"The total concrete volume for the B2 floor slab reached 3,530m\u00b3\" width=\"2048\" height=\"1536\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/be-tong-1.png 2048w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/be-tong-1-533x400.png 533w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/be-tong-1-1067x800.png 1067w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/be-tong-1-768x576.png 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/be-tong-1-1536x1152.png 1536w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><figcaption id=\"caption-attachment-718\" class=\"wp-caption-text\"><span style=\"color: #282828;\">The total concrete volume for the B2 floor slab reached 3,530m\u00b3<\/span><\/figcaption><\/figure>\n<p data-path-to-node=\"8\"><span style=\"color: #282828;\">Throughout many consecutive nights, the site lights did not just illuminate technical operations; they reflected the sense of responsibility, persistence, and pride of the entire Van Lang collective.<\/span><\/p>\n<p data-path-to-node=\"9\"><span style=\"color: #282828;\">From material inspection, surveying, and checking reinforcement and formwork to coordinating concrete mixer trucks, every process was operated with absolute precision. This ensured continuity, safety, and optimal quality for the B2 basement slab specifically, and the entire project in general.<\/span><\/p>\n<figure id=\"attachment_717\" aria-describedby=\"caption-attachment-717\" style=\"width: 1535px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-717 size-full\" style=\"font-size: 14.4px;\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt-10.png\" alt=\"Under the site lights for many long nights, the Van Lang team worked persistently with a &quot;steel spirit&quot; and unwavering focus.\" width=\"1535\" height=\"2048\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt-10.png 1535w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt-10-300x400.png 300w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt-10-600x800.png 600w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt-10-768x1025.png 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt-10-1151x1536.png 1151w\" sizes=\"auto, (max-width: 1535px) 100vw, 1535px\" \/><figcaption id=\"caption-attachment-717\" class=\"wp-caption-text\"><span style=\"color: #282828;\">Under the site lights for many long nights, the Van Lang team worked persistently with a &#8220;steel spirit&#8221; and unwavering focus.<\/span><\/figcaption><\/figure>\n<p><span style=\"color: #282828;\"><strong>Mr. Le Duc Dong, Deputy Project Manager of Hacom Mall, shared:<\/strong> <i data-path-to-node=\"11\" data-index-in-node=\"63\">\u201cWe are not just building a project; we are building prestige and trust. Each batch of concrete poured is a concrete commitment from Van Lang to our partners and the community.\u201d<\/i><\/span><\/p>\n<figure id=\"attachment_716\" aria-describedby=\"caption-attachment-716\" style=\"width: 2048px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-716 size-full\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b11.png\" alt=\"Mr. Dong and the Site Management team stayed awake for many consecutive nights to complete the set plan.\" width=\"2048\" height=\"1536\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b11.png 2048w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b11-533x400.png 533w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b11-1067x800.png 1067w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b11-768x576.png 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b11-1536x1152.png 1536w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><figcaption id=\"caption-attachment-716\" class=\"wp-caption-text\"><span style=\"color: #282828;\">Mr. Dong and the Site Management team stayed awake for many consecutive nights to complete the set plan.<\/span><\/figcaption><\/figure>\n<p><span style=\"color: #282828;\"><strong>Mr. Huynh Hang Thien Sinh, Survey Supervisor<\/strong>-who has been with the site since the early days-emotionally shared: <i data-path-to-node=\"13\" data-index-in-node=\"113\">\u201cUnder the yellow lights, every time a pour is completed at the right position and the right elevation, I feel a surge of pride. It is not just because the task is done, but because we are one step closer to our collective dream.\u201d<\/i><\/span><\/p>\n<h3 data-path-to-node=\"14\"><span style=\"color: #282828;\">Hacom Mall \u2013 New Milestone, New Stature<\/span><\/h3>\n<p data-path-to-node=\"15\"><span style=\"color: #282828;\">Hacom Mall is a key commercial center project in Phan Rang \u2013 Thap Cham City, developed by Thanh Dong Ninh Thuan JSC. The project consists of two towers with 25 stories and 2 basements, with a total floor area (GFA) of over 60,000m\u00b2.<\/span><\/p>\n<p data-path-to-node=\"16\"><span style=\"color: #282828;\">With its strategic location and prominent scale, Hacom Mall is not only a new commercial highlight of the region but also a comprehensive test for any General Contractor-regarding capacity, mettle, and long-term vision.<\/span><\/p>\n<figure id=\"attachment_715\" aria-describedby=\"caption-attachment-715\" style=\"width: 2048px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-715 size-full\" style=\"font-size: 14.4px;\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b14.png\" alt=\"Workers laboring through the night, silently building each layer of concrete as if constructing solid dreams for future generations.\" width=\"2048\" height=\"1536\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b14.png 2048w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b14-533x400.png 533w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b14-1067x800.png 1067w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b14-768x576.png 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/b14-1536x1152.png 1536w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><figcaption id=\"caption-attachment-715\" class=\"wp-caption-text\">Workers laboring through the night, silently building each layer of concrete as if constructing solid dreams for future generations.<\/figcaption><\/figure>\n<p><span style=\"color: #282828;\">The completion of the B2 basement is a vital prerequisite for Van Lang to accelerate the &#8220;closing&#8221; of the basement (basement roof slab) and prepare to enter the superstructure construction phase\u2014where commercial blocks, amenities, and landscaped spaces will gradually take shape. This is when the project&#8217;s true values begin to be defined, and the expectations of the Developer and the community begin to become a reality.<\/span><\/p>\n<h3 data-path-to-node=\"19\"><span style=\"color: #282828;\">Van Lang \u2013 Building Value, Constructing Trust<\/span><\/h3>\n<p data-path-to-node=\"20\"><span style=\"color: #282828;\">With every project, Van Lang General Contractor commits to on-time delivery while constantly raising construction standards to ensure safety, quality, and project efficiency.<\/span><\/p>\n<p data-path-to-node=\"21\"><span style=\"color: #282828;\">At Hacom Mall, these values are once again affirmed-as a strong commitment to brand prestige, general contractor capacity, and the mission to accompany Developers on the journey of creating sustainable, modern structures that bring long-lasting value to the community.<\/span><\/p>\n<figure id=\"attachment_714\" aria-describedby=\"caption-attachment-714\" style=\"width: 2048px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-714 size-full\" style=\"font-size: 14.4px;\" src=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt4.png\" alt=\"Quality \u2013 Safety \u2013 Efficiency are the three criteria that Van Lang commits to upholding at Hacom Mall.\" width=\"2048\" height=\"1536\" srcset=\"https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt4.png 2048w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt4-533x400.png 533w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt4-1067x800.png 1067w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt4-768x576.png 768w, https:\/\/vanlangdc.com\/wp-content\/uploads\/2025\/11\/bt4-1536x1152.png 1536w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><figcaption id=\"caption-attachment-714\" class=\"wp-caption-text\">Quality \u2013 Safety \u2013 Efficiency are the three criteria that Van Lang commits to upholding at Hacom Mall.<\/figcaption><\/figure>\n<p style=\"text-align: right;\"><span style=\"color: #282828;\"><em>Lan Anh<\/em><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>While the city fell into a deep sleep, a silent but extraordinary &#8220;transformation&#8221; took place at the Hacom Mall Commercial Center project (Dong Hai Ward, Ninh Thuan Province). More than 380m\u00b3\u00a0of concrete were poured in the final batch for the B2 basement floor slab, officially completing the deepest basement level of the project. This is [&#8230;]\n","protected":false},"author":1,"featured_media":1817,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1814","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts\/1814","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/comments?post=1814"}],"version-history":[{"count":3,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts\/1814\/revisions"}],"predecessor-version":[{"id":1819,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/posts\/1814\/revisions\/1819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/media\/1817"}],"wp:attachment":[{"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/media?parent=1814"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/categories?post=1814"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vanlangdc.com\/en\/wp-json\/wp\/v2\/tags?post=1814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}